𝘐𝘯𝘴𝘵𝘢𝘭𝘭 𝘍𝘳𝘢𝘨𝘮𝘦𝘯𝘵: Nitrile gloves on the edge of a trash bin. The gloves are of people who helped me install my second solo exhibition, titled 𝘊𝘭𝘦𝘢𝘳𝘢𝘯𝘤𝘦, that took place at Chicago Art Department in 2019. Photo taken on 4/12/2019.
Install Fragment: Wood glue dripping from hole in a plywood wall that was used to cord manage through it. Photo taken on 8/3/2021
Install Fragment: Plugging a hole in a plywood wall with a 1.5” diameter wooden dowel. Photo taken on 8/3/2021
Install Fragment: Gaffer tape barrier on the floor between the viewer and artwork at The Art Institute of Chicago (Installed by their install team). Photo taken on 11/27/2021
Install Fragment: First drawer of tool cart at SITE Galleries. Photo taken on 7/27/2021
𝙄𝙣𝙨𝙩𝙖𝙡𝙡 𝙁𝙧𝙖𝙜𝙢𝙚𝙣𝙩𝙨: Shadow of a ladder on a temporary wall that I was prepping to then add joint compound on the seams. Photo taken on 2/1/2022
𝙄𝙣𝙨𝙩𝙖𝙡𝙡 𝙁𝙧𝙖𝙜𝙢𝙚𝙣𝙩𝙨: Painters’ tape and drywall tape between seams of a wall before applying joint compound. Photo take on 4/9/2021, School of the Art Institute Leroy Neiman Center Lobby , INCUBATOR Temporary Wall.
𝙄𝙣𝙨𝙩𝙖𝙡𝙡 𝙁𝙧𝙖𝙜𝙢𝙚𝙣𝙩𝙨: Spackled drywall at the St. Louis Art Museum by their team. Photo take on 6/5/2022, St. Louis Art Museum.
𝘐𝘯𝘴𝘵𝘢𝘭𝘭 𝘍𝘳𝘢𝘨𝘮𝘦𝘯𝘵: Taped and spackled drywall joints on a wall at the St. Louis Museum of Art (SAMA). Photo taken on 6/5/2022.
𝙄𝙣𝙨𝙩𝙖𝙡𝙡 𝙁𝙧𝙖𝙜𝙢𝙚𝙣𝙩𝙨: Using laser level to level sparkly vinyl on SITE Galleries’ title wall. Photo taken on 3/24/2023
𝙄𝙣𝙨𝙩𝙖𝙡𝙡 𝙁𝙧𝙖𝙜𝙢𝙚𝙣𝙩𝙨: White tape peeling off from a wall at an EXPO Chicago gallery booth. Photo taken on 4/15/2023
𝙄𝙣𝙨𝙩𝙖𝙡𝙡 𝙁𝙧𝙖𝙜𝙢𝙚𝙣𝙩𝙨: Student gallery staff learning how to install 60” from center. Photo take on 3/24/2021, School of the Art Institute of Chicago Galleries.
𝙄𝙣𝙨𝙩𝙖𝙡𝙡 𝙁𝙧𝙖𝙜𝙢𝙚𝙣𝙩𝙨: Crating my own artwork for the Giviing Shape Exhibition at the National Museum of Mexican Art. Photo taken on 3/27/2023
𝙄𝙣𝙨𝙩𝙖𝙡𝙡 𝙁𝙧𝙖𝙜𝙢𝙚𝙣𝙩𝙨: Do Not Touch sign in vinyl at Contemporary Blue Star, San Antonio TX. Photo taken on 12/28/2022
𝙄𝙣𝙨𝙩𝙖𝙡𝙡 𝙁𝙧𝙖𝙜𝙢𝙚𝙣𝙩𝙨: Razor scrapping protrusions, “volcanoes”, on a wall from when screws were taken out of it during a deinstall at SITE Galleries, Chicago. Photo taken on 5/6/2022
𝙄𝙣𝙨𝙩𝙖𝙡𝙡 𝙁𝙧𝙖𝙜𝙢𝙚𝙣𝙩𝙨: stanchion and stanchion sign during an install in progress at the Chicago Cultural Center, Chicago. Photo taken on 1/20/2023